Skip to content
xifre.dev

Five rules, all automated

Every project here follows them. Each one is backed by a check that fails the build, a skill the agents load, or a public record.

1

Look before drawing.

I start each design from a study of other sites, some an awards jury picked and some that just caught my eye, and measure each one the same way: type, colour, layout.

Skill: benchmark · 17 sites studied so far.

Carbon · Linear Method · Our World in Data grapher · Plausible · rauno.me · Autopilot · brandonyasin.com · bratiiev.com · Cafeteria 2027 · Creative Reference Library · GitHub repository · martinfoucaut.com · PlanetScale benchmarks · Primer · romainavalle.dev · Super Eight · tomdekoning.work

All studies →
2

Write decisions down.

3

Plan the whole job.

Each project starts from a template with every task the job needs, what each one waits on, and what went wrong last time.

82 lessons from past projects so far.

  • Custom projectAnything no other template fits, such as a developer tool, a package or an internal feature. It starts with a few recommended blocks every project tends to need, which the project switches off where they don't fit; Claude drafts the rest with you into the project file, and you check the map here before anything is filed.
  • New websiteA new site built as a Nuxt app, with Markdown or a CMS for content. The owner signs off four times: scope, brand, design and go-live.
  • Website rebuildAn existing site, usually WordPress, rebuilt as a Nuxt app on the same brand. The owner signs off three times: scope, design and go-live.
Project maps →
4

Let agents do the legwork.

Every change runs the same 6 steps from plan to merge, and reviews for architecture, correctness and tests must pass before it lands. Any step can stop and ask me.

  1. PickTakes the next ticket and reads everything it links to.
  2. PlanLists the files to change, each copied from an existing example.
  3. BuildWrites the change, then runs lint, types and tests.
  4. ReviewThree agents review architecture, correctness and tests at once.
  5. PolishTrims comments and checks the docs still match the code.
  6. ShipOpens the pull request and merges it once CI passes.
How a change gets merged →
5

Check every change.

These run on every push and again in CI.

  • Tests
    563 test files, from single functions to full pages in a real browser.If coverage drops below the minimum, the build fails.Coverage by project →
  • Accessibility
    Pages are tested against WCAG AA in a real browser.One violation fails the build.The shared test kit →
  • Lint rules
    589 lint rules on, 8 of them written for this repo.Turning one off needs a written reason.Which rules fire most →
  • Repository
    Repo-wide rules are checked on every commit, push and CI run.No hand-edited version numbers, no leftover TODOs.The checks →
  • System design
    Each app is split into layers, and a layer can only use the ones below it.Crossing a boundary is a lint error.Dependency graph →
  • Observability
    The apps report their errors and slow requests.A slow click can be traced to the query behind it.Observability setup →
Case studyHuella Legal → A law magazine rebuilt with these five rules.